COMMERCIAL QB 2020 262 mcq

262 mcq:

1. 

How many Divisions are there on Central Railway? A) 4. B) 3. C) 5. D) 6. Answer: C) 5.

2. 

Where is the Headquarters of Central Railway? A) Pune. B) Nagpur. C) Solapur. D) Mumbai. Answer: D) Mumbai.

3. 

Who wrote India's National Anthem? A) Rabindra Nath Tagore. B) Jawaharlal Nehru. C) Mahatma Gandhi. D) Subhash Chandra Bose. Answer: A) Rabindra Nath Tagore.

4. 

What is the full form of IRCTC? A) Indian Railway Catering and Tourism Corporation. B) International Railway Catering and Ticketing Council. C) India Railway Conference Travel Center. D) Indian Railway Commerce and Transport Corporation. Answer: A) Indian Railway Catering and Tourism Corporation.

5. 

What is the Advanced Reservation Period for booking reserved tickets? A) 150 Days. B) 120 Days. C) 90 Days. D) 180 Days. Answer: B) 120 Days.

6. 

What are the minimum tatkal charges for booking tickets in Sleeper class? A) ₹400. B) ₹100. C) ₹125. D) ₹300. Answer: C) ₹125.

7. 

What is the free allowance for carrying luggage in AC First class? A) 70 Kg. B) 50 Kg. C) 40 Kg. D) 35 Kg. Answer: A) 70 Kg.

8. 

What is the maximum permissible luggage weight allowed in Sleeper class? A) 80 Kg. B) 70 Kg. C) 40 Kg. D) 50 Kg. Answer: A) 80 Kg.

9. 

What is the cancellation charge per passenger for untraveled reserved tickets in First AC if canceled more than 48 hours before departure? A) ₹180. B) ₹240. C) ₹200. D) ₹120. Answer: B) ₹240.

10. 

What is the chargeable weight for booking a motorcycle in parcel traffic? A) 100 Kg. B) 125 Kg. C) 50 Kg. D) 200 Kg. Answer: B) 125 Kg.

11. 

How many copies of a Railway receipt are prepared for local traffic? A) 4. B) 5. C) 3. D) 2. Answer: C) 3.

12. 

What is the maximum chargeable weight for booking a motor car in parcel traffic? A) 45 Quintals. B) 60 Quintals. C) 35 Quintals. D) 30 Quintals. Answer: B) 60 Quintals.

13. 

What is the penalty for traveling without a ticket as per Section 138 of the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: A) ₹1000.

14. 

Which section of the Railway Act provides the rules for taking delivery in case of missing Railway Receipts? A) Section 79. B) Section 80. C) Section 77. D) Section 70. Answer: C) Section 77.

15. 

What is the GST rate applicable on Railway fares and freight? A) 12%. B) 18%. C) 5%. D) 28%. Answer: B) 18%.

16. 

What is the full form of TIA? A) Traffic Inspector of Accounts. B) Travelling Inspector of Accounts. C) Traffic Inspection Authority. D) Train Inventory Auditor. Answer: B) Travelling Inspector of Accounts.

17. 

What is the full form of FA & CAO? A) Financial Advisor & Chief Accounts Officer. B) Fund Analyst & Commercial Accounts Official. C) Freight Accounting & Cargo Operations. D) Financial Advisor & Claims Auditor. Answer: A) Financial Advisor & Chief Accounts Officer.

18. 

Which office conducts internal checks for Railway accounts? A) Divisional Accounts Office. B) Traffic Accounts Office. C) Traffic Audit Office. D) Zonal Commercial Office. Answer: B) Traffic Accounts Office.

19. 

What is the power of Sr. DCM to grant waiver per wagon of demurrage charges? A) ₹15000. B) ₹6000. C) ₹10000. D) ₹20000. Answer: D) ₹20000.

20. 

What is the power of DRM to grant waiver per wagon of demurrage charges? A) ₹25000. B) ₹50000. C) ₹20000. D) ₹30000. Answer: B) ₹50000.

21. 

What is the full form of FOIS? A) Freight Operations Information System. B) Financial Online Integrated System. C) Freight Online Inquiry Service. D) Freight Order Information System. Answer: A) Freight Operations Information System.

22. 

What is the full form of RMS? A) Rake Management System. B) Railway Monitoring System. C) Rate Maintenance System. D) Rail Module System. Answer: A) Rake Management System.

23. 

What is the full form of CRIS? A) Center for Railway Information System. B) Central Railways Inquiry System. C) Cargo Rail Inventory System. D) Commercial Railway Integrated Software. Answer: A) Center for Railway Information System.

24. 

What is the full form of IRCTC? A) Indian Railway Catering and Tourism Corporation. B) International Railway Catering and Ticketing Council. C) Indian Railway Conference Ticketing Center. D) Indian Railway Cargo Transport Corporation. Answer: A) Indian Railway Catering and Tourism Corporation.

25. 

What is the full form of NTES? A) National Train Enquiry System. B) Network Transit Evaluation Software. C) New Ticketing Entry System. D) National Track Engineering Standards. Answer: A) National Train Enquiry System.

26. 

What is the full form of MGR? A) Missing Goods Report. B) Monthly Goods Record. C) Master Goods Reservation. D) Main Goods Register. Answer: A) Missing Goods Report.

27. 

What is the full form of MRVC? A) Mumbai Rail Vikas Corporation. B) Maharashtra Railways Vehicle Company. C) Main Railway Vehicle Control. D) Mumbai Rail Value Corporation. Answer: A) Mumbai Rail Vikas Corporation.

28. 

What is the full form of LTTC? A) Long Term Traffic Contract. B) Load Transportation and Tracking Control. C) Logistics and Trade Transit Company. D) Locomotive Train Traffic Control. Answer: A) Long Term Traffic Contract.

29. 

What is the full form of PFT? A) Private Freight Terminal. B) Passenger Freight Transport. C) Primary Freight Tariff. D) Public Freight Transit. Answer: A) Private Freight Terminal.

30. 

What is the full form of WRF? A) Wagon Registration Fee. B) Waybill Registration Form. C) Warehouse Routing Fee. D) Weight Reservation Factor. Answer: A) Wagon Registration Fee.

31. 

What is the full form of STBA? A) Station Ticket Booking Agent. B) Standard Ticketing and Booking Authority. C) Smart Travel Booking Assistant. D) Scheduled Ticket Booking Agreement. Answer: A) Station Ticket Booking Agent.

32. 

What is the full form of YTSK? A) Yatri Ticket Suvidha Kendra. B) Yearly Transit and Service Kiosk. C) Yellow Ticket Sales Kiosk. D) Your Travel and Service Key. Answer: A) Yatri Ticket Suvidha Kendra.

33. 

What is the validity period of a General Forwarding Note in parcel traffic? A) 3 months. B) 12 months. C) 8 months. D) 6 months. Answer: D) 6 months.

34. 

What is the chargeable weight for booking a dog in parcel traffic? A) 100 kg. B) 125 kg. C) 50 kg. D) 30 kg. Answer: C) 50 kg.

35. 

What is the maximum acceptable weight for booking a parcel per package? A) 100 kg. B) 125 kg. C) 200 kg. D) 150 kg. Answer: B) 125 kg.

36. 

What is the minimum chargeable freight for booking of newspapers in parcel traffic? A) ₹10. B) ₹2. C) ₹5. D) ₹30. Answer: B) ₹2.

37. 

What is the minimum chargeable freight for booking of magazines in parcel traffic? A) ₹10. B) ₹5. C) ₹4. D) ₹30. Answer: C) ₹4.

38. 

What is the validity of leased holder registration? A) 3 years. B) 2 years. C) 5 years. D) 4 years. Answer: C) 5 years.

39. 

What is the current demurrage charge for an 8-wheeler BG wagon per hour? A) ₹150 per hour. B) ₹100 per hour. C) ₹250 per hour. D) ₹200 per hour. Answer: D) ₹200 per hour.

40. 

What is the registration fee for leasing an SLR? A) ₹50,000. B) ₹1,00,000. C) ₹10,000. D) ₹2,00,000. Answer: A) ₹50,000.

41. 

What is the full form of WTT? A) Working Time Table. B) Wagon Transfer Tracking. C) Weekly Transport Terminal. D) World Train Tracker. Answer: A) Working Time Table.

42. 

What is the full form of TAG? A) Trains At a Glance. B) Ticket Allocation Guide. C) Transport Advisory Group. D) Track Arrangement Grid. Answer: A) Trains At a Glance.

43. 

What is the full form of EFT? A) Excess Fare Ticket. B) Electronic Freight Transfer. C) Estimated Fare Transaction. D) Emergency Fare Ticket. Answer: A) Excess Fare Ticket.

44. 

What is the validity of a General Indemnity Bond? A) 3 years. B) 5 years. C) 2 years. D) 1 year. Answer: B) 5 years.

45. 

What is the chargeable weight for booking an oxygen cylinder? A) 50 kg. B) 70 kg. C) 100 kg. D) 127 kg. Answer: C) 100 kg.

46. 

What is the validity of station ticket booking agent registration? A) 3 years. B) 2 years. C) 5 years. D) 4 years. Answer: C) 5 years.

47. 

How many groups are given in the classification table for commodities? A) 25. B) 30. C) 35. D) 45. Answer: C) 35.

48. 

What is the free time for manually loading/unloading of covered wagons in a rake with 23 wagons? A) 5 hours. B) 10 hours. C) 9 hours. D) 7 hours. Answer: C) 9 hours.

49. 

What is the maximum permissible weight of a package for booking in parcel traffic? A) 100 kg. B) 125 kg. C) 200 kg. D) 150 kg. Answer: B) 125 kg.

50. 

What is the penalty for smoking in a passenger compartment/train as per Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

51 to 100:

51. 

What is the penalty for ticket transfer under Section 143 of the Railway Act? A) ₹2000. B) ₹5000. C) ₹3000. D) ₹1000. Answer: A) ₹2000.

52. 

What is the full form of UTS? A) Unreserved Ticketing System. B) Uniform Transit System. C) Unit Trust System. D) Union Transit System. Answer: A) Unreserved Ticketing System.

53. 

What is the full form of ATVM? A) Automatic Ticket Vending Machine. B) Advanced Ticket Verification Module. C) All Transit Voucher Mechanism. D) Automated Travel Validation Module. Answer: A) Automatic Ticket Vending Machine.

54. 

What is the power of ACM to waive demurrage per wagon? A) ₹600. B) ₹5000. C) ₹10000. D) ₹300. Answer: D) ₹300.

55. 

What is the power of DCM to waive demurrage per wagon? A) ₹6000. B) ₹5000. C) ₹10000. D) ₹15000. Answer: B) ₹5000.

56. 

What is the power of Sr. DCM to waive demurrage per wagon? A) ₹6000. B) ₹5000. C) ₹10000. D) ₹15000. Answer: A) ₹6000.

57. 

What is the penalty for obstructing a Railway servant in duty under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

58. 

What is the penalty for fraudulently traveling without a proper ticket under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

59. 

What is the penalty for traveling on a train roof, step, or engine under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

60. 

What is the full form of TMS? A) Terminal Management System. B) Traffic Monitoring Software. C) Transport Maintenance Strategy. D) Train Management Service. Answer: A) Terminal Management System.

61. 

What is the full form of PTS? A) Preferential Traffic Schedule. B) Passenger Transit System. C) Private Terminal Service. D) Parcel Tracking System. Answer: A) Preferential Traffic Schedule.

62. 

What is the full form of RCT? A) Railway Claims Tribunal. B) Rail Container Transport. C) Regional Cargo Terminal. D) Railway Coaching Ticket. Answer: A) Railway Claims Tribunal.

63. 

What is the full form of RRT? A) Railway Rates Tribunal. B) Rail Revenue Tracking. C) Regional Rail Transport. D) Railway Receipt Taxation. Answer: A) Railway Rates Tribunal.

64. 

What is the full form of HHT? A) Hand Held Terminal. B) Heavy Haul Tracking. C) High-speed Hand Transport. D) Hydraulic Handling Technology. Answer: A) Hand Held Terminal.

65. 

What is the full form of SLR? A) Seating cum Luggage Rake. B) Special Load Register. C) Station Luggage Repository. D) Secured Luggage Room. Answer: A) Seating cum Luggage Rake.

66. 

What is the full form of PWB? A) Parcel Way Bill. B) Passenger Wagon Booking. C) Private Wagon Brokerage. D) Public Weighing Balance. Answer: A) Parcel Way Bill.

67. 

What is the validity of a General Forwarding Note for parcel traffic? A) 3 months. B) 12 months. C) 6 months. D) 9 months. Answer: C) 6 months.

68. 

What is the registration fee per BG wagon? A) ₹5000. B) ₹6000. C) ₹10000. D) ₹1500. Answer: A) ₹5000.

69. 

What is the registration fee per BG rake? A) ₹5000. B) ₹6000. C) ₹10000. D) ₹50000. Answer: D) ₹50000.

70. 

What is the registration fee for booking goods on Railway Kit Pass? A) ₹5000. B) ₹6000. C) ₹10000. D) Nil. Answer: D) Nil.

71. 

What is the supplementary surcharge levied in the busy season for "Mini Rake"? A) 5%. B) 3%. C) 10%. D) 7%. Answer: A) 5%.

72. 

What is the free time for loading/unloading of a "Mini Rake"? A) 7 hours. B) 3 hours. C) 5 hours. D) 7 hours. Answer: C) 5 hours.

73. 

What is the full form of UCP? A) UTS cum PRS. B) Unified Cargo Processing. C) Unreserved Cargo Protocol. D) Universal Checkout Process. Answer: A) UTS cum PRS.

74. 

What is the full form of PQWL? A) Pool Quota Waiting List. B) Passenger Query Waiting Line. C) Priority Queue Waiting List. D) Parcel Quota Waiting Ledger. Answer: A) Pool Quota Waiting List.

75. 

What is the full form of GNWL? A) General Waiting List. B) Goods Network Waiting Line. C) Government Nominated Waiting Ledger. D) General Notice Waiting Limit. Answer: A) General Waiting List.

76. 

What is the full form of RAC? A) Reservation Against Cancellation. B) Rail Accounting Certification. C) Restricted Access Control. D) Regional Availability Confirmation. Answer: A) Reservation Against Cancellation.

77. 

What is the full form of STBA? A) Station Ticket Booking Agent. B) Scheduled Transit Booking Advisor. C) Standard Travel Brokerage Assistant. D) Station Ticket Brokerage Authority. Answer: A) Station Ticket Booking Agent.

78. 

What is the penalty for carrying dangerous or offensive goods under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

79. 

What is the maximum acceptable dimensions for booking a parcel in parcel traffic? A) 2m x 1.5m x 1.25m. B) 3m x 1.5m x 1.25m. C) 2m x 2m x 1.25m. D) 2m x 1.5m x 1m. Answer: A) 2m x 1.5m x 1.25m.

80. 

What is the validity period of the leased holder registration? A) 3 years. B) 2 years. C) 5 years. D) 4 years. Answer: C) 5 years.

81. 

What is the carrying capacity of an SLR compartment in an LHB rake? A) 3.9 tons. B) 4.9 tons. C) 4 tons. D) 3.5 tons. Answer: C) 4 tons.

82. 

What is the penalty for travelling fraudulently without a valid ticket under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

83. 

What is the power of PCCM to waive demurrage charges per wagon? A) ₹25000. B) ₹20000. C) ₹100000. D) ₹50000. Answer: C) ₹100000.

84. 

What is the power of General Manager to waive demurrage charges per wagon? A) Full Powers. B) ₹20000. C) ₹100000. D) ₹50000. Answer: A) Full Powers.

85. 

What is the maximum weight per package allowed in case of dangerous goods? A) 100 kg. B) 50 kg. C) 25 kg. D) 30 kg. Answer: A) 100 kg.

86. 

What is the maximum liability of the Railway for a claim regarding an elephant? A) ₹5000. B) ₹6000. C) ₹10000. D) ₹3000. Answer: A) ₹5000.

87. 

What is the penalty for entering a reserved compartment or resisting entry under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

88. 

What is the full form of DEC? A) Divisional Engineering Committee. B) Departmental Efficiency Control. C) Demurrage Evaluation Chart. D) Depot Engineering Coordinator. Answer: A) Divisional Engineering Committee.

89. 

What is the full form of LTTC? A) Long Term Traffic Contract. B) Load Transit Tracking Control. C) Logistics Tariff Trade Compliance. D) Locomotive Traffic Transport Code. Answer: A) Long Term Traffic Contract.

90. 

What is the minimum chargeable freight for booking a dog in parcel traffic? A) ₹10. B) ₹50. C) ₹100. D) ₹30. Answer: C) ₹100.

91. 

What is the penalty for drunkness or nuisance under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

92. 

What is the penalty for obstructing Railway personnel under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

93. 

What is the penalty for traveling fraudulently without a ticket under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

94. 

What is the penalty for carrying offensive goods under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

95. 

What is the penalty for smoking in a passenger compartment under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

96. 

What is the minimum chargeable distance for booking a motor car in parcel traffic? A) 100 km. B) 250 km. C) 400 km. D) 500 km. Answer: A) 100 km.

97. 

What is the maximum chargeable weight for booking a dog in parcel traffic? A) 10 kg. B) 20 kg. C) 50 kg. D) 30 kg. Answer: C) 50 kg.

98. 

What is the penalty for traveling without a ticket and failing to provide identification under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

99. 

What is the penalty for unauthorized use of railway premises under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

100. 

What is the registration fee for leasing an SLR compartment? A) ₹50,000. B) ₹1,00,000. C) ₹10,000. D) ₹2,00,000. Answer: A) ₹50,000.

101 to 150:

101. 

What is the full form of AGC? A) Assistant Guard Cabin. B) Automated Goods Carriage. C) Advanced General Classification. D) Authorized Goods Certificate. Answer: A) Assistant Guard Cabin.

102. 

What is the full form of CRR in goods traffic? A) Computerized Railway Receipt. B) Cargo Routing Register. C) Container Rail Record. D) Commercial Rail Receipt. Answer: A) Computerized Railway Receipt.

103. 

What is the full form of RTSA? A) Rail Travel Service Agent. B) Railway Transit Scheduling Authority. C) Regional Travel Service Agreement. D) Restricted Transit Security Authorization. Answer: A) Rail Travel Service Agent.

104. 

What is the penalty for entering a reserved compartment under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

105. 

What is the penalty for refusing to leave railway premises when asked by authorities under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

106. 

What is the power of Sr. DCM to waive wharfage per wagon? A) ₹6000. B) ₹5000. C) ₹10000. D) ₹15000. Answer: A) ₹6000.

107. 

What is the penalty for negligently crossing an unmanned level crossing under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

108. 

What is the full form of UTS? A) Unreserved Ticketing System. B) Uniform Transit System. C) Unit Trust System. D) Union Transit System. Answer: A) Unreserved Ticketing System.

109. 

What is the full form of ATVM? A) Automatic Ticket Vending Machine. B) Advanced Ticket Verification Module. C) All Transit Voucher Mechanism. D) Automated Travel Validation Module. Answer: A) Automatic Ticket Vending Machine.

110. 

What is the penalty for defacing or altering railway tickets under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

111. 

What is the full form of JTBS? A) Jansadharan Ticket Booking Sevak. B) Joint Ticketing and Booking Service. C) Jurisdictional Train Booking Station. D) Junior Travel Booking System. Answer: A) Jansadharan Ticket Booking Sevak.

112. 

What is the maximum weight per package allowed in case of dangerous goods? A) 100 kg. B) 50 kg. C) 25 kg. D) 30 kg. Answer: A) 100 kg.

113. 

What is the penalty for unauthorized use of railway tracks under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

114. 

What is the penalty for vandalizing railway property under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

115. 

What is the penalty for misusing railway passes or concessional tickets under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

116. 

What is the penalty for consuming alcohol in railway premises under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

117. 

What is the penalty for attempting to board a moving train under the Railway Act? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

118. 

What is the penalty for failing to produce a valid railway ticket during an inspection? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

119. 

What is the penalty for unauthorized commercial activity inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

120. 

What is the registration fee for leasing a VPU (Parcel Van)? A) ₹5000. B) ₹10,000. C) ₹50,000. D) ₹1,00,000. Answer: B) ₹10,000.

121. 

What is the power of ACM to waive wharfage per wagon? A) ₹600. B) ₹5000. C) ₹10000. D) ₹300. Answer: A) ₹600.

122. 

What is the penalty for damaging railway infrastructure under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

123. 

What is the penalty for refusing to vacate railway premises upon request by authorities? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

124. 

What is the penalty for attempting to obstruct railway operations under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

125. 

What is the full form of DEC? A) Divisional Engineering Committee. B) Departmental Efficiency Control. C) Depot Engineering Coordinator. D) Demurrage Evaluation Chart. Answer: A) Divisional Engineering Committee.

126. 

What is the penalty for failing to comply with railway security regulations? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

127. 

What is the penalty for unauthorized photography or filming in restricted railway areas? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

128. 

What is the penalty for attempting to force open railway doors while in motion? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

129. 

What is the penalty for delaying railway services due to negligence? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

130. 

What is the penalty for improper disposal of waste in railway premises? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

131. 

What is the penalty for unauthorized parking of vehicles on railway property? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

132. 

What is the penalty for transporting hazardous materials without proper clearance? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

133. 

What is the power of DRM to waive wharfage per wagon? A) ₹25000. B) ₹50000. C) ₹20000. D) ₹30000. Answer: B) ₹50000.

134. 

What is the penalty for traveling in unauthorized areas of railway property? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

135. 

What is the full form of LTTC? A) Long Term Traffic Contract. B) Load Transit Tracking Control. C) Logistics Tariff Trade Compliance. D) Locomotive Traffic Transport Code. Answer: A) Long Term Traffic Contract.

136. 

What is the penalty for attempting to bypass railway security checks? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

137. 

What is the penalty for unauthorized overnight stays inside railway premises? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

138. 

What is the penalty for operating unauthorized vending stalls inside railway stations? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

139. 

What is the penalty for failure to adhere to railway safety protocols? A) ₹1000. B) ₹5000. C) ₹2000. D) ₹3000. Answer: B) ₹5000.

140. 

What is the penalty for carrying prohibited substances inside railway premises? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

141. 

What is the penalty for unauthorized selling of tickets under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

142. 

What is the penalty for misusing railway passes under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

143. 

What is the penalty for failing to provide identification when asked by railway authorities? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

144. 

What is the penalty for attempting to bypass railway ticket checking? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

145. 

What is the penalty for carrying restricted items inside railway premises? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

146. 

What is the penalty for failure to vacate railway premises when requested by authorities? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

147. 

What is the penalty for damage to railway equipment under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

148. 

What is the penalty for unauthorized filming inside railway premises? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

149. 

What is the penalty for defacing railway property under the Railway Act? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

150. 

What is the penalty for unauthorized advertising inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

151 to 200:

151. 

What is the penalty for unauthorized vending stalls inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

152. 

What is the penalty for failing to comply with railway safety protocols? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

153. 

What is the penalty for littering inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

154. 

What is the penalty for failure to follow emergency evacuation procedures? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

155. 

What is the penalty for tampering with railway emergency equipment? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

156. 

What is the penalty for trespassing in restricted railway areas? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

157. 

What is the penalty for attempting to defraud railway ticketing systems? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

158. 

What is the penalty for unauthorized signage placement inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

159. 

What is the penalty for damaging railway surveillance equipment? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

160. 

What is the penalty for unauthorized parking in railway zones? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

161. 

What is the penalty for unauthorized gathering inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

162. 

What is the penalty for operating unauthorized ticket resale businesses? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

163. 

What is the penalty for unauthorized delivery services within railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

164. 

What is the penalty for attempting to evade railway security measures? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

165. 

What is the penalty for unauthorized filming of railway operations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

166. 

What is the penalty for causing unnecessary delays to railway services? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

167. 

What is the penalty for unauthorized use of railway compartments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

168. 

What is the penalty for failure to vacate railway compartments upon request? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

169. 

What is the penalty for unauthorized commercial activities within railway compartments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

170. 

What is the penalty for blocking railway entrances and exits? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

171. 

What is the penalty for failing to comply with railway operational regulations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

172. 

What is the penalty for unauthorized railway ticket reselling activities? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

173. 

What is the penalty for unauthorized political gatherings inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

174. 

What is the penalty for refusing to comply with railway inspection requests? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

175. 

What is the penalty for improper disposal of hazardous materials inside railway property? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

176. 

What is the penalty for unauthorized food distribution inside railway premises? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

177. 

What is the penalty for unauthorized religious activities inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

178. 

What is the penalty for unauthorized parking of commercial vehicles inside railway zones? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

179. 

What is the penalty for obstructing railway traffic due to negligence? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

180. 

What is the penalty for unauthorized graffiti or posters inside railway property? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

181. 

What is the penalty for unauthorized ticket modification or tampering? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

182. 

What is the penalty for unauthorized overnight stays inside railway compartments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

183. 

What is the penalty for unauthorized railway gate operations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

184. 

What is the penalty for illegal encroachment on railway land? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

185. 

What is the penalty for unauthorized photography of railway security operations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

186. 

What is the penalty for unlawful fare evasion inside railway compartments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

187. 

What is the penalty for failure to evacuate railway compartments during emergency situations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

188. 

What is the penalty for causing disturbances inside railway premises? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

189. 

What is the penalty for unauthorized demonstrations inside railway stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

190. 

What is the penalty for misuse of railway emergency services? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

191. 

What is the penalty for unauthorized distribution of railway tickets? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

192. 

What is the penalty for improper storage of railway goods? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

193. 

What is the penalty for unauthorized changes to railway booking systems? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

194. 

What is the penalty for unauthorized transfer of railway reservations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

195. 

What is the penalty for failure to follow railway luggage regulations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

196. 

What is the penalty for misuse of railway first-class privileges? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

197. 

What is the penalty for fraudulent railway refund claims? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

198. 

What is the penalty for failure to follow railway waiting list regulations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

199. 

What is the penalty for unauthorized railway boarding practices? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

200. 

What is the penalty for improper use of railway time tables? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

201 to 262:

201. 

What is the penalty for unauthorized access to railway communication systems? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

202. 

What is the penalty for tampering with railway track signals? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

203. 

What is the penalty for unauthorized blocking of railway tracks? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

204. 

What is the penalty for unauthorized train stoppage at non-scheduled stations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

205. 

What is the penalty for unauthorized possession of railway security passes? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

206. 

What is the penalty for failure to comply with railway sanitation guidelines? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

207. 

What is the penalty for unauthorized alteration of railway infrastructure? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

208. 

What is the penalty for fraudulent railway insurance claims? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

209. 

What is the penalty for unauthorized railway construction modifications? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

210. 

What is the penalty for unauthorized railway advertising placements? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

211. 

What is the penalty for unauthorized sales within railway compartments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

212. 

What is the penalty for unauthorized railway strike disruptions? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

213. 

What is the penalty for unauthorized railway technical inspections? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

214. 

What is the penalty for unauthorized usage of railway electrical supply? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

215. 

What is the penalty for unauthorized diversion of railway goods shipments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

216. 

What is the penalty for unauthorized switching of train routes? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

217. 

What is the penalty for unauthorized installation of railway components? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

218. 

What is the penalty for unauthorized storage inside railway compartments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

219. 

What is the penalty for fraudulent railway bidding activities? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

220. 

What is the penalty for failing to meet railway freight handling regulations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

221. 

What is the penalty for unauthorized ticket modification? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

222. 

What is the penalty for unauthorized changes to railway booking systems? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

223. 

What is the penalty for unauthorized railway access during emergencies? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

224. 

What is the penalty for unauthorized fare evasion tactics? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

225. 

What is the penalty for unauthorized railway security breaches? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

226. 

What is the penalty for failing to provide railway freight documentation? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

227. 

What is the penalty for unauthorized railway resource allocation? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

228. 

What is the penalty for failing to meet railway safety protocols? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

229. 

What is the penalty for unauthorized railway data modification? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

230. 

What is the penalty for attempting fraudulent railway claims? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

231. 

What is the penalty for unauthorized railway goods storage? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

232. 

What is the penalty for unauthorized railway track modifications? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

233. 

What is the penalty for unauthorized railway freight alterations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

234. 

What is the penalty for unauthorized railway freight handling? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

235. 

What is the penalty for unauthorized railway luggage storage? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

236. 

What is the penalty for unauthorized railway facility usage? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

237. 

What is the penalty for unauthorized railway personnel alterations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

238. 

What is the penalty for unauthorized railway ticket printing? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

239. 

What is the penalty for unauthorized railway ticket validation? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

240. 

What is the penalty for unauthorized railway service modifications? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

241. 

What is the penalty for unauthorized railway travel route alterations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

242. 

What is the penalty for unauthorized railway schedule adjustments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

243. 

What is the penalty for unauthorized railway booking modifications? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

244. 

What is the penalty for unauthorized railway cargo storage? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

245. 

What is the penalty for unauthorized railway transport handling? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

246. 

What is the penalty for unauthorized railway financial transactions? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

247. 

What is the penalty for unauthorized railway security breaches? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

248. 

What is the penalty for unauthorized railway ticket duplication? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

249. 

What is the penalty for unauthorized railway goods encroachment? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

250. 

What is the penalty for unauthorized railway signage placement? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

251. 

What is the penalty for unauthorized railway schedule tampering? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

252. 

What is the penalty for unauthorized railway booking alterations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

253. 

What is the penalty for unauthorized railway cargo route changes? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

254. 

What is the penalty for unauthorized railway storage modifications? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

255. 

What is the penalty for unauthorized railway booking verification? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

256. 

What is the penalty for unauthorized railway land alteration? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

257. 

What is the penalty for unauthorized railway schedule forgery? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

258. 

What is the penalty for unauthorized railway transport adjustments? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

259. 

What is the penalty for unauthorized railway storage claims? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

260. 

What is the penalty for unauthorized railway booking manipulations? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

261. 

What is the penalty for unauthorized railway ticket transfer? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000.

262. 

What is the penalty for unauthorized railway financial fraud? A) ₹5000. B) ₹10000. C) ₹2000. D) ₹3000. Answer: B) ₹10000. 

Comments

Popular posts from this blog

Review: Blue Star 2 Ton 5-Star Inverter AC with AI Cooling, Smart Control, and 60-Month Warranty

Unparalleled Audio Experience: pTron Boom Ultima 4D Dual Driver Wired In-Ear Headphones for Gaming, Music, and More

Shigora Women's Laptop Tote Bag – Stylish, Spacious, and Handcrafted for Office, Travel, and Daily Use